New line going in? We set it, level it, anchor it, and commission it, then we don’t leave until it’s running at spec. Bakery ovens, bottling and canning lines, conveyance, server racks. The same crew that builds equipment knows how it’s supposed to behave once it’s bolted down.
Equipment Installs
Heavy production equipment set, leveled, anchored, and commissioned. Bakery ovens to bottling lines to server racks.
How it works
-
Site walk and rigging plan
We measure the door, the aisle, the floor, and the ceiling before anything ships. The rigging plan comes out of that walk, not out of a template.
-
Receive and stage
Equipment comes off the truck, gets inventoried against the packing list, and is staged in the order it goes in.
-
Set, level, anchor
The heavy work. Modules set in sequence, leveled against the floor you actually have, and anchored.
-
Connect and integrate
Gas train, conveyance tie-in, controls, and instrumentation. The line gets connected to the line it has to live with.
-
Commission and run to spec
We run it, tune it, and work the punch list. We do not leave until it is making product the way it is supposed to.
What's included
Everything below is part of the scope. If what you need isn't on the list, ask us.
- Pre-install site walk, measurements, and a written rigging plan.
- Receiving, inventory against the packing list, and staged set sequence.
- Millwright set, leveling, shimming, and anchoring.
- Gas train and burner manifold connection.
- Conveyance tie-in to the upstream and downstream line.
- Controls and instrumentation integration.
- Commissioning, tuning, and punch-list closeout.
- Handoff to your operators with the line running at spec.
On the job
Why bring equipment installs to us.
The crew that builds it installs it
We have manufactured industrial baking systems since 1976. The people bolting your oven down have built one from plate steel. They know what it is supposed to sound like.
One crew, start to finish
Rigging, set, connection, and commissioning under one roof. Nothing falls through the gap between a rigger, a millwright, and a controls vendor.
We finish the job
Diagnose first, document everything, finish the job. The punch list gets closed, not handed to you.
Equipment Installs: common questions
How long does an install take?
Two to six weeks is typical for a production line, from the truck arriving to product running at spec. Scope, site access, and how much of the line is being tied in all move that number.
Do I need to hire a separate rigger?
No. We build the rigging plan and own the move. That is the point of one crew from start to finish.
What does commissioning actually include?
Running the equipment, tuning it, working the punch list, and handing it off to your operators with the line making product to spec. Not a signature on a delivery receipt.
Do you install outside of bakery?
Yes. Installs and relocations are the work that carries across industries: bottling and canning lines, conveyance, server racks, and heavy equipment all get set, leveled, anchored, and commissioned the same way.
Can you work around our production schedule?
Tell us the window when you call. We plan the set sequence around the shutdown you can actually give us.
Need equipment installs? Tell us.
Reviewed by a Field Crew lead, not a sales rep. Initial scope reply within one business day.